Construction will begin soon at the Shawnee Campus. Since most of the work is being done at or near the main entrance there will be some changes in the way you access the building. The pedestrian path into the building may change during the project so it will be well marked with construction fencing. If the main doors are not available, we will provide access through the east sanctuary door. The lower-level entrance will not change during construction, so it’s a good option if you are able to use the stairs. The ushers will be familiar with the changes and provide assistance if needed. Be sure to watch eNews each week to get updates on the changes as construction progresses.
Print Friendly, PDF & Email