The renovation continues! We are now in the dry-wall phase. These photos depict the storage enclosure as well as the in-fill in the wall in the Kitchen Annex and the enclosed transition between the annex and the Fellowship Hall.
![](https://i0.wp.com/tlcms.org/wp-content/uploads/2017/08/Renovations-Underway-20170816.jpg?resize=355%2C149)
![](https://i0.wp.com/tlcms.org/wp-content/uploads/2017/08/Renovations-Underway-2-20170816.jpg?resize=353%2C265)
The renovation continues! We are now in the dry-wall phase. These photos depict the storage enclosure as well as the in-fill in the wall in the Kitchen Annex and the enclosed transition between the annex and the Fellowship Hall.